Washington, IA interconnection queue

3 active projects totaling 1,075 MW in the MISO queue, plus 6 with terminal status (shown grayed).

3active projects
1,075active MW
9total filed
Queue IDProjectkVMWResourceStatus
J4114 Not reported n/r 525 Gas Active
G973 Not reported 345 501 Wind Withdrawn
R50 Not reported 345 501 Wind Withdrawn
J154 Not reported 161 500 Wind Withdrawn
J192 Not reported 345 500 Wind Withdrawn
J2945 Not reported 345 350 Gas Active
J2363 Not reported 161 226 Wind Withdrawn
J2002 Not reported n/r 200 Solar Active
J981 Not reported 345 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.