Waseca, MN interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
G337 Not reported n/r 55 Gas Withdrawn
H069 Not reported 69 55 Wind Withdrawn
H042 Not reported 69 50 Wind Withdrawn
H053 Not reported 69 50 Wind Withdrawn
J345 Not reported 69 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.