Ward, ND interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
J212 Not reported 230 600 Wind Withdrawn
J880 Not reported 230 150 Wind Withdrawn
G783 Not reported n/r 122 Wind Withdrawn
G784 Not reported n/r 122 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.