Wapello, IA interconnection queue

4 active projects totaling 618 MW in the MISO queue, plus 3 with terminal status (shown grayed).

4active projects
618active MW
7total filed
Queue IDProjectkVMWResourceStatus
G718 Not reported n/r 900 Coal Withdrawn
G129 Not reported n/r 600 Other Withdrawn
G719 Not reported n/r 600 Coal Withdrawn
J3713 Not reported 161 200 Wind Active
J4173 Not reported 161 199 Battery Active
J4086 Not reported 161 120 Solar Active
J4172 Not reported 161 99 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.