Queue IDProjectkVMWResourceStatus
J2046 Not reported 138 200 Solar Withdrawn
J1854 Not reported 138 150 Solar Withdrawn
J2229 Not reported 138 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.