Substation Scout

Vermilion Parish, LA interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2535 Not reported 138 210 Battery Withdrawn
J3738 Not reported 69 65 Solar Withdrawn
J3631 Not reported 69 60 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.