Substation Scout

Union Parish, LA interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2381 Not reported 115 200 Solar Withdrawn
J2531 Not reported 115 140 Battery Withdrawn
J2336 Not reported 115 125 Hybrid Withdrawn
J2533 Not reported 115 100 Solar Withdrawn
J3839 Not reported 115 50 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.