Tyler, TX interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3610 Not reported n/r 150 Solar Withdrawn
J2114 Not reported 138 140 Hybrid Withdrawn
J2243 Not reported 138 100 Solar Withdrawn
J2253 Not reported n/r 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.