Tipton, IN interconnection queue

2 active projects totaling 167 MW in the MISO queue, plus 5 with terminal status (shown grayed).

2active projects
167active MW
7total filed
Queue IDProjectkVMWResourceStatus
G923 Not reported 230 200 Wind Withdrawn
J054 Not reported 230 197.8 Wind Withdrawn
J1625 Not reported 230 150 Solar Withdrawn
G952 Not reported 230 100 Wind Withdrawn
J2232 Not reported 230 100 Battery Active
J1765 Not reported 230 93.2 Solar Withdrawn
J2177 Not reported 230 67 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.