Substation Scout

Taylor, IA interconnection queue

2 active projects totaling 700 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
700active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3022 Not reported 345 400 Battery Withdrawn
J3701 Not reported 345 400 Wind Active
J2369 Not reported 345 300 Wind Active
J2166 Not reported 161 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first