Tallahatchie, MS interconnection queue

2 active projects totaling 200 MW in the MISO queue, plus 4 with terminal status (shown grayed).

2active projects
200active MW
6total filed
Queue IDProjectkVMWResourceStatus
J2964 Not reported 115 220 Wind Withdrawn
J4064 Not reported n/r 200 Wind Withdrawn
J2182 Not reported 115 100 Solar Withdrawn
J2391 Not reported 115 100 Solar Withdrawn
J908 Not reported 115 100 Solar Active
S1116 Surplus; J908 n/r 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.