Stoddard, MO interconnection queue

2 active projects totaling 425 MW in the MISO queue, plus 5 with terminal status (shown grayed).

2active projects
425active MW
7total filed
Queue IDProjectkVMWResourceStatus
J3337 Not reported n/r 230 Solar Withdrawn
J1034 Not reported 161 225 Solar Active
J2524 Not reported 161 200 Solar Active
J3906 Not reported 161 140 Battery Withdrawn
J782 Not reported 161 100 Solar Withdrawn
J1033 Not reported 161 50 Battery Withdrawn
J2387 Not reported 161 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.