Substation Scout

Steele, MN interconnection queue

1 active project totaling 44 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
44active MW
4total filed
Queue IDProjectkVMWResourceStatus
G728 Not reported 161 300 Wind Withdrawn
J016 Not reported 115 200 Wind Withdrawn
G604 Not reported 69 44 Wind Operational
H047 Not reported 69 35 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first