Steele, MN interconnection queue
1 active project totaling 44 MW in the MISO queue, plus 3 with terminal status (shown grayed).
1active projects
44active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G728 | Not reported | 161 | 300 | Wind | Withdrawn |
| J016 | Not reported | 115 | 200 | Wind | Withdrawn |
| G604 | Not reported | 69 | 44 | Wind | Operational |
| H047 | Not reported | 69 | 35 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.