Substation Scout

Starke, IN interconnection queue

3 active projects totaling 480 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3active projects
480active MW
6total filed
Queue IDProjectkVMWResourceStatus
J1684 Not reported 345 200 Solar Active
J2959 Not reported 345 200 Hybrid Withdrawn
J2847 Not reported 345 180 Solar Active
J3196 Not reported 138 100 Solar Withdrawn
J3207 Not reported 138 100 Solar Active
J1342 Not reported 138 99 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.