Substation Scout

St. Tammany Parish, LA interconnection queue

1 active project totaling 450 MW in the MISO queue, plus 5 with terminal status (shown grayed).

1active projects
450active MW
6total filed
Queue IDProjectkVMWResourceStatus
J2914 Not reported 500 450 Hybrid Active
J1674 Not reported 230 250 Hybrid Withdrawn
J464 Not reported n/r 200 Solar Withdrawn
J1698 Not reported 230 150 Hybrid Withdrawn
J2245 Not reported 230 100 Hybrid Withdrawn
J3210 Not reported n/r 100 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first