St. Martin Parish, LA interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1595 Not reported 138 100 Solar Withdrawn
J1850 Not reported 138 100 Solar Withdrawn
J1887 Not reported 69 90 Solar Withdrawn
J3364 Not reported 69 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.