Substation Scout

St. John The Baptist Parish, LA interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
150active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3042 Not reported 230 150 Solar Active
J1797 Not reported 230 100 Solar Withdrawn
J1959 Not reported 230 100 Solar Withdrawn
J1956 Not reported 230 60 Battery Withdrawn
J1958 Not reported 230 60 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first