St. Helena Parish, LA interconnection queue

2 active projects totaling 800 MW in the MISO queue, plus 3 with terminal status (shown grayed).

2active projects
800active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2302 Not reported 500 400 Hybrid Active
J3591 Not reported 500 400 Hybrid Active
J2769 Not reported 115 200 Solar Withdrawn
J3068 Not reported 115 110 Hybrid Withdrawn
J640 Not reported 115 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.