Substation Scout

St. Charles, MO interconnection queue

2 active projects totaling 2,205 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
2,205active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3996 Not reported n/r 2,220 Gas Active
J1986 Not reported 161 100 Battery Withdrawn
G920 Not reported 138 -15 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first