Substation Scout

Spencer, IN interconnection queue

3 active projects totaling 340 MW in the MISO queue, plus 4 with terminal status (shown grayed).

3active projects
340active MW
7total filed
Queue IDProjectkVMWResourceStatus
J1642 Not reported 138 200 Hybrid Active
J1835 Not reported 138 200 Wind Withdrawn
J3721 Not reported 138 200 Solar Withdrawn
J2960 Not reported n/r 150 Hybrid Withdrawn
J1227 Not reported 138 125 Solar Withdrawn
J759 Not reported 161 70 Solar Operational
J783 Not reported n/r 70 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.