Simpson, MS interconnection queue

1 active project totaling 165 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
165active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2873 Not reported 161 165 Solar Active
J3577 Not reported 115 120 Solar Withdrawn
J2887 Not reported 161 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.