Substation Scout

Sibley, MN interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
H064 Not reported 69 39 Wind Withdrawn
G357 Not reported n/r 20 Wind Withdrawn
G587 Not reported 69 20 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first