Sheridan, ND interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J1456 Not reported 230 300 Wind Withdrawn
J780 Not reported 230 200 Wind Withdrawn
J1622 Not reported 230 100 Solar Withdrawn
G951 Not reported 230 99 Wind Withdrawn
G916 Not reported 230 53 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.