Shawano, WI interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
G249 Not reported n/r 110 Gas Withdrawn
J2537 Not reported 345 100 Battery Withdrawn
J1996 Not reported 138 99 Hybrid Withdrawn
J2544 Not reported 345 95 Solar Withdrawn
G332 Not reported n/r 80 Wind Withdrawn
G333 Not reported n/r 80 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.