Sharkey, MS interconnection queue

1 active project totaling 120 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
120active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3115 Not reported 115 216 Hybrid Withdrawn
J2685 Not reported n/r 120 Solar Active
J2940 Not reported 115 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.