Scott, IA interconnection queue
2 active projects totaling 150 MW in the MISO queue, plus 1 with terminal status (shown grayed).
2active projects
150active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J360 | Not reported | 69 | 116 | Gas | Withdrawn |
| J1131 | Not reported | 161 | 100 | Solar | Active |
| J1477 | Not reported | 161 | 50 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.