Substation Scout

Schoolcraft, MI interconnection queue

2 active projects totaling 10 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
10active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1264 Not reported 69 20 Gas Withdrawn
G345 Not reported n/r 5 Other Operational
G346 Not reported n/r 5 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first