Substation Scout

Sargent, ND interconnection queue

1 active project totaling 90 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
90active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3266 Not reported 230 175 Battery Withdrawn
H088 Not reported 230 150 Wind Withdrawn
J2094 Not reported 230 100 Battery Withdrawn
J2913 Not reported 115 90 Battery Active
J2896 Not reported 115 80 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first