Saline, IL interconnection queue

8 active projects totaling 1,135 MW in the MISO queue.

8active projects
1,135active MW
8total filed
Queue IDProjectkVMWResourceStatus
J2793 Not reported n/r 250 Solar Active
J3732 Not reported 138 175 Hybrid Active
J1096 Not reported 138 150 Solar Active
J1302 Not reported 138 150 Solar Active
J2151 Not reported 138 150 Hybrid Active
J3916 Not reported 138 100 Solar Active
J1208 Not reported 138 80 Solar Active
J1209 Not reported 138 80 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.