Substation Scout

Saline, AR interconnection queue

2 active projects totaling 390 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
390active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3530 Not reported 500 500 Solar Withdrawn
J2149 Not reported 115 240 Solar Active
J2955 Not reported 115 150 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first