Substation Scout

Rusk, WI interconnection queue

1 active project totaling 416.5 MW in the MISO queue.

1active projects
416.5active MW
1total filed
Queue IDProjectkVMWResourceStatus
J3975 Not reported 345 416.5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first