Substation Scout

Rush, IN interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 7 with terminal status (shown grayed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
H014 Not reported 138 300 Wind Withdrawn
J1737 Not reported 345 210 Solar Withdrawn
J1593 Not reported 345 200 Solar Withdrawn
J2421 Not reported 345 200 Battery Withdrawn
J2746 Not reported n/r 70 Solar Withdrawn
J2340 Not reported 69 43 Solar Withdrawn
J1318 Not reported 69 25 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first