Substation Scout

Roseau, MN interconnection queue

1 active project totaling 500 MW in the MISO queue.

1active projects
500active MW
1total filed
Queue IDProjectkVMWResourceStatus
J3532 Not reported 500 500 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first