Substation Scout

Roberts, SD interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 6 with terminal status (shown grayed).

1active projects
200active MW
7total filed
Queue IDProjectkVMWResourceStatus
G884 Not reported n/r 1,500 Wind Withdrawn
H095 Not reported 230 550 Wind Withdrawn
G982 Not reported 230 300 Wind Withdrawn
G699 Not reported 230 250 Wind Withdrawn
J3824 Not reported 345 250 Battery Withdrawn
J266 Not reported 345 200 Wind Withdrawn
J2852 Not reported 230 200 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.