Substation Scout

Ripley, IN interconnection queue

1 active project totaling 250 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
250active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2581 Not reported 138 250 Battery Active
J2255 Not reported 345 100 Battery Withdrawn
J2442 Not reported 138 84 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first