Richland, ND interconnection queue
1 active project totaling 172 MW in the MISO queue.
1active projects
172active MW
1total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J4170 | Not reported | 230 | 172 | Hybrid | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner