Substation Scout

Richland, ND interconnection queue

1 active project totaling 172 MW in the MISO queue.

1active projects
172active MW
1total filed
Queue IDProjectkVMWResourceStatus
J4170 Not reported 230 172 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first