Rapides Parish, LA interconnection queue

4 active projects totaling 1,630 MW in the MISO queue, plus 12 with terminal status (shown grayed).

4active projects
1,630active MW
16total filed
Queue IDProjectkVMWResourceStatus
E0048 Not reported n/r 775 Gas Active
J2916 Not reported 230 400 Solar Withdrawn
J3209 Not reported n/r 350 Solar Active
J3014 Not reported 138 280 Solar Active
J3197 Not reported n/r 250 Solar Withdrawn
J3479 Not reported n/r 225 Solar Active
J1220 Not reported 230 200 Solar Withdrawn
J2529 Not reported 230 200 Solar Withdrawn
J2339 Not reported 230 125 Solar Withdrawn
J1999 Not reported n/r 100 Solar Withdrawn
J2470 Not reported 138 100 Solar Withdrawn
J3793 Not reported 230 100 Solar Withdrawn
J636 Not reported 138 52 Other Withdrawn
J1238 Not reported 230 50 Battery Withdrawn
J2082 Not reported n/r 50 Solar Withdrawn
J3138 Not reported 230 49.3 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.