Substation Scout

Randolph, MO interconnection queue

3 active projects totaling 1,615 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3active projects
1,615active MW
6total filed
Queue IDProjectkVMWResourceStatus
J1490 Not reported 345 1,000 Other Active
J1488 Not reported 345 500 Other Active
J3350 Not reported 161 200 Solar Withdrawn
J3533 Not reported 161 200 Wind Withdrawn
J3411 Not reported 161 120 Solar Withdrawn
J2382 Not reported 161 115 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first