Putnam, IN interconnection queue
2 active projects totaling 300 MW in the MISO queue, plus 10 with terminal status (shown grayed).
2active projects
300active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G075 | Not reported | n/r | 500 | Other | Withdrawn |
| G304 | Not reported | n/r | 250 | Gas | Withdrawn |
| J1548 | Not reported | 345 | 200 | Solar | Withdrawn |
| J1563 | Not reported | 230 | 200 | Solar | Withdrawn |
| J3146 | Not reported | n/r | 200 | Solar | Withdrawn |
| J3144 | Not reported | 345 | 150 | Solar | Active |
| J3145 | Not reported | 345 | 150 | Solar | Active |
| J3804 | Not reported | 345 | 100 | Battery | Withdrawn |
| J3813 | Not reported | 345 | 100 | Battery | Withdrawn |
| J3143 | Not reported | n/r | 50 | Solar | Withdrawn |
| J3707 | Not reported | n/r | 40 | Solar | Withdrawn |
| J3740 | Not reported | n/r | 40 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.