Pulaski, IN interconnection queue

2 active projects totaling 945 MW in the MISO queue, plus 5 with terminal status (shown grayed).

2active projects
945active MW
7total filed
Queue IDProjectkVMWResourceStatus
J2846 Not reported 345 700 Solar Active
J3119 Not reported n/r 350 Hybrid Withdrawn
J2849 Not reported 345 245 Solar Active
J1726 Not reported 345 200 Solar Withdrawn
J3257 Not reported 138 190 Solar Withdrawn
J883 Not reported n/r 80 Wind Withdrawn
J2780 Not reported 69 33 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.