1 active project totaling 115.5 MW in the MISO queue, plus 7 with terminal status (shown grayed).

1active projects
115.5active MW
8total filed
Queue IDProjectkVMWResourceStatus
J3195 Not reported 115 200 Solar Withdrawn
J3413 Not reported 115 150 Hybrid Withdrawn
J2350 Not reported 115 115.5 Solar Active
J2412 Not reported 115 100 Battery Withdrawn
J684 Not reported n/r 100 Solar Withdrawn
J2828 Not reported 115 50 Hybrid Withdrawn
J3001 Not reported 115 50 Battery Withdrawn
J507 Not reported n/r 16.7 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.