Substation Scout

Presque Isle, MI interconnection queue

3 active projects totaling 551.5 MW in the MISO queue, plus 4 with terminal status (shown grayed).

3active projects
551.5active MW
7total filed
Queue IDProjectkVMWResourceStatus
G820 Not reported 138 600 Coal Withdrawn
J960 Not reported 345 400 Wind Withdrawn
J2260 Not reported 138 251.5 Wind Active
J1914 Not reported 138 150 Solar Active
J2875 Not reported 138 150 Solar Active
J890 Not reported 138 100 Wind Withdrawn
J296 Not reported n/r 69.3 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first