Prairie, AR interconnection queue
0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3303 | Not reported | 500 | 400 | Solar | Withdrawn |
| J3301 | Not reported | 115 | 180 | Solar | Withdrawn |
| J695 | Not reported | n/r | 99 | Solar | Withdrawn |
| J2264 | Not reported | 500 | 88 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.