Porter, IN interconnection queue

4 active projects totaling 1,870.2 MW in the MISO queue, plus 8 with terminal status (shown grayed).

4active projects
1,870.2active MW
12total filed
Queue IDProjectkVMWResourceStatus
E0035 Malden CCGT 345 1,089.8 Gas Active
E0039 Malden BESS 345 630.4 Battery Active
H087 Not reported 345 300 Wind Withdrawn
J1742 Not reported 345 294.1 Solar Withdrawn
J1412 Not reported 345 250 Solar Withdrawn
J1447 Not reported 345 250 Solar Withdrawn
J2711 Not reported 138 122 Solar Withdrawn
J1407 Not reported 138 100 Solar Active
J1960 Not reported 138 100 Solar Withdrawn
J1683 Not reported 345 75 Battery Withdrawn
J3140 Not reported 138 50 Battery Active
J1976 Not reported 138 25 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first