Polk, MN interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 11 with terminal status (shown grayed).

1active projects
150active MW
12total filed
Queue IDProjectkVMWResourceStatus
J3952 Not reported n/r 395 Solar Withdrawn
J1081 Not reported 115 300 Wind Withdrawn
J062 Not reported 115 250 Wind Withdrawn
J3951 Not reported n/r 218 Solar Withdrawn
H032 Not reported 230 180 Wind Withdrawn
J2291 Not reported n/r 150 Solar Withdrawn
J2749 Not reported 115 150 Solar Active
J2286 Not reported 230 90 Solar Withdrawn
J1941 Not reported n/r 60 Solar Withdrawn
J077 Not reported 115 50 Wind Withdrawn
J2285 Not reported n/r 45 Battery Withdrawn
J1968 Not reported n/r 30 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.