Substation Scout

Poinsett, AR interconnection queue

2 active projects totaling 240 MW in the MISO queue, plus 9 with terminal status (shown grayed).

2active projects
240active MW
11total filed
Queue IDProjectkVMWResourceStatus
J2386 Not reported 161 300 Solar Withdrawn
J3569 Not reported 161 300 Solar Withdrawn
J3571 Not reported 161 250 Solar Withdrawn
J3373 Not reported 161 200 Solar Withdrawn
J3969 Not reported n/r 196 Solar Withdrawn
J3536 Not reported 161 190 Hybrid Withdrawn
J2928 Not reported 161 160 Solar Withdrawn
J4174 Not reported n/r 140 Battery Active
J2773 Not reported 161 100 Hybrid Active
J948 Not reported 161 100 Solar Withdrawn
J2521 Not reported 161 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first