Plymouth, IA interconnection queue
3 active projects totaling 600 MW in the MISO queue, plus 1 with terminal status (shown grayed).
3active projects
600active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1114 | Not reported | 345 | 200 | Wind | Withdrawn |
| J1590 | Not reported | n/r | 200 | Wind | Active |
| J506 | Not reported | 345 | 200 | Wind | Operational |
| J748 | Not reported | 345 | 200 | Wind | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.