Pike, IL interconnection queue
1 active project totaling 100 MW in the MISO queue, plus 4 with terminal status (shown grayed).
1active projects
100active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G654 | Not reported | 138 | 250 | Wind | Withdrawn |
| J3506 | Not reported | 138 | 100 | Battery | Withdrawn |
| J3685 | Not reported | 138 | 100 | Solar | Active |
| J3385 | Not reported | 138 | 50 | Solar | Withdrawn |
| J1066 | Not reported | 69 | 44 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.