Pike, IL interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
100active MW
5total filed
Queue IDProjectkVMWResourceStatus
G654 Not reported 138 250 Wind Withdrawn
J3506 Not reported 138 100 Battery Withdrawn
J3685 Not reported 138 100 Solar Active
J3385 Not reported 138 50 Solar Withdrawn
J1066 Not reported 69 44 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.