Pierce, WI interconnection queue

1 active project totaling 75 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
75active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2068 Not reported 69 75 Solar Active
J801 Not reported 161 74 Solar Withdrawn
J1569 Not reported 69 44 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.