Pemiscot, MO interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3102 Not reported 500 500 Hybrid Withdrawn
J3106 Not reported 500 500 Hybrid Withdrawn
J3429 Not reported 161 160 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.